Texas Group

The Texas Group Head Office was in dire need of restoration and refurbishment when they called Restoration Projects in to give the building a new lease on life.Our works included:

  • Stripping and replacing all defective partitions and plasterwork.
  • Giving ceilings and covings a smooth plaster finish to the original specifications.
  • Bringing the external facade back to life, including chemical brick cleaning.
  • Repairing feature stone work.
  • Stripping and refurbishing office areas.
  • Installing fire protection throughout the building.
  • Refurbishing existing toilets.
  • Restoring bronze balustrades.

  • Location: Eccles, Manchester
  • Project Length 20 Weeks